Home › Projects › Bellevue Gutter Replacement
High Point Gutter replaced 504 feet of gutter on a large cedar shake home in Bellevue, WA 98006 in July 2026. The new system is 6-inch K-style seamless aluminum, with hardpipes and valley diverters to handle a roof that sends a lot of water to a few spots. See our other Bellevue projects.
| Location | Bellevue, WA 98006 |
| Service | Full gutter replacement |
| Property | Large home with a cedar shake roof, several roof levels and valleys, brick planters below the eaves |
| New gutter | 504 linear feet of 6-inch K-style seamless aluminum, low gloss white |
| Corners | 21, hand-mitered on site |
| Downspouts | 175 linear feet of new 2×3 aluminum |
| Hardpipes | 6, musket brown |
| Valley diverters | 5 |
| Other details | 50 feet of counter flashing, 4 closed cutbacks, 7 transitions to 4-inch underground drains |
| Also included | Exterior cleaning of 2 skylights |
| Project investment range | $11,700 to $15,200 |
| Dates | Assessed June 22; installed July 16 to 17, 2026 |
What we found
The homeowner asked for a full replacement. The old corners were pieced together, with dark staining at every seam and layers of old sealant. Inside the troughs under the shakes, the gutter floors held debris and were stained along their length. The roof has several levels and valleys, and some upper downspouts emptied directly onto the roof below.



What we recommended
A new 6-inch system, which holds more water than standard 5-inch, plus six hardpipes to carry the upper downspouts across the roof into the lower gutters and five valley diverters so valley runoff drops into the gutter instead of shooting over the front edge. The downspouts were replaced too, with seven transitions into the 4-inch underground drains. More on gutter replacement.
The work
The old gutters came off July 16 and were recycled. A storm came through that night, and our crew installed the full system the next day. The homeowner had stained the shake roof, which left it slippery even when dry, so the roof work went slowly.
The gutter was formed on site and hung on hidden hangers every 24 inches with 1.5-inch galvanized hex-head screws and neoprene washers, sloped a quarter inch per 10 feet. All 21 corners were mitered by hand. The hardpipes are musket brown to blend with the shakes. We also cleaned the outside of the two skylights while on the roof.


Cost
Project investment range: $11,700 to $15,200. This range reflects the scope of this completed project and is not a current quote. Footage drives most of the price, and 504 feet with new downspouts throughout is a large system.
Related questions
Should I tell a gutter contractor if my roof has been stained or treated?
Yes. Stains and sealers can make shakes or shingles slick, which changes how a crew sets up and how long roof work takes.
About this project
This project documentation was prepared by High Point Gutter from the job records and photos from our crew, October 2026. Technical review by Ben Metsker, Manager, High Point Gutter.
High Point Gutter provides gutter replacement in Bellevue and across the Greater Seattle Area.
Upper downspouts emptying onto a lower roof?
We can look at where your water goes and plan the gutter system around it. Request a free inspection or call High Point Gutter at (425) 449-6622.